Language
Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-12-14 13:00
180
shyiying(Mr.)
Beijing
QINGYUAN DISTRICT, BAODING CITY, HEBEI, Baoding, Hebei, China (071051)
Model | CD1-0.25 | CD1-0.5 | CD1-1 | CD1-2 | CD1-3 | CD1-5 | CD1-10 |
Capacity(t) | 0.25 | 0.5 | 1 | 2 | 3 | 5 | 10 |
Standard lift(m) | 3-9 | 6-12 | 6-30 | 6-30 | 6-30 | 6-30 | 9-30 |
Lifting speed(m/min) | 88/0.8 | 88/0.8 | 88/0.8 | 88/0.8 | 88/0.8 | 77/0.7 | |
Running speed(m/min) | 20(30) | 20(30) | 20(30) | 20(30) | 20(30) | 20(30) | 20(30) |
Wire rope type | 6x37-4.8-180 | 6x37-7.4-180 | 6x37-11-155 | 6x37-13-170 | 6x37-15-200 | 6x37-17.5-200 | |
I Beam track type | 16-22b | 16-28b | 16-28b | 20a-32c | 20a-32c | 25a-63c | 28a-63c |
Loop track minimum radius(m) | 0.8 | 1.5 | 1.5-4 | 2-4 | 2-4 | 2.5-5 | 3.5-9 |
Voltage(V) | 380 | 380 | 380 | 380 | 380 | 380 | 380 |
Frequency(Hz) | 50 | 50 | 50 | 50 | 50 | 50 | 50 |
Phase | 3 | 3 | 3 | 3 | 3 | 3 | 3 |